







A new entrance door to replace that window with a double hung to the right. Flooring will continue into the kitchen through that opening which will be widened. Those studs were left out for the bathroom install.












A new entrance door to replace that window with a double hung to the right. Flooring will continue into the kitchen through that opening which will be widened. Those studs were left out for the bathroom install.



